Documents of the Inception Phase

During the first 3 months of the KEP implementing period (04.07.2016-03.10.2016) different documents were finalised in order to check and re-adjust the work plan, the logical framework matrix and the programming documents to take into consideration the background and financial modifications incurred from the KEP design (June 2015) to the KEP start (July 2016). Together with the Draft Inception Report, the first drafts of the Procurement Plan, Administrative Manual and Framework Implementing Manual were also finalised.